Secondary Electrical Upgrades Project (PSC005)
In Building 64: Replace existing switchboard, motor control center, and variable frequency drive equipment with new equipment. Add new remote input/output equipment. In Building 75: Replace existing motor control center and variable frequency drive equipment with new equipment. Add new remote input/output equipment. Provide a temporary motor control center and associated temporary conductors to facilitate equipment replacement in Buildings 64 and 75.
Plans
(click to expand/collapse)
Name | Size | ||
PSC005_Plans_Bid Set | 17.0 MB |