WWTP Solids Facility Conduit & Wire Project -PSH009
Project Description: Replacement of corroded electrical conduits, conductors, and enclosures with corrosion resistant materials throughout the Dewatering Building.
For Reference Only
(click to expand/collapse)
Name | Size | |||
05_1994 SOLIDS PROCESSING FACILITY_Reference Only | 35.5 MB |
Plans
(click to expand/collapse)
Name | Size | ||
01_23-12-18_PSH009_IFB DWGs | 12.8 MB |