DOM 4 Lift Station MCC and CP Replacement Project, CWP013
Project Description: Replacement of outdated Motor Control Center (MCC) lineup including Variable Frequency Drives (VFD), Control Panel (CP) with Operator Interface Terminal (OIT), as well as necessary conductors and conduits; providing a temporary motor control center and associated temporary conductors to facilitate equipment replacement; completion and testing of facilities and all other work necessary and incidental to complete the work as shown on the Plans and indicated in the Contract Documents.
Bid Documents
(click to expand/collapse)
Name | Size | ||
02_2024-02-06 IFB Specs_CWP013 | 5.6 MB | ||
03_CWP013_PART A_Fillable | 624.3 KB | ||
04_CWP013_PART B_Fillable | 613.0 KB | ||
06_COV MI SS Rehabilitation Project DOM 4 Panel_2005 | 13.5 MB |